If a problem occurs within the UPS, review all alarm messages along with other pertinent data. Con-
tact Liebert Services at 1-800-LIEBERT to report a problem or to request assistance.
3.7
Corrective Actions
For each alarm message on the Display Screen, you can find the recommended corrective action in 
Table 7.
3.8
Upstream Feeder Circuit Breaker Setting Inspections
During normal UPS operations, short-term overload current demand from the bypass source may 
reach 10 times the UPS output current rating. This overload current demand may be caused by the 
magnetizing inrush current of one or more downstream transformers (i.e., power distribution units) 
or faults on downstream branch circuits. The instantaneous trip point(s) of the upstream bypass 
feeder breaker(s) must be set to support these temporary overloads. The magnitude of short-term 
overload bypass current demand is typically six to eight times the UPS current rating, but must be 
determined by analysis on a per-site basis. This analysis, generally known as an End-to-End Fault 
Coordination Study, must be done by a registered professional engineer experienced in this activity 
and familiar with local codes and related requirements.
Liebert strongly recommends periodic inspections of the bypass feeder breaker instantaneous trip set-
tings, as well as the module input (rectifier) feeder breaker trip settings, to ensure that they are cor-
rect. For a variety of reasons, although typically during circuit breaker maintenance procedures by 
others, trip settings have been known to be inadvertently left improperly set. Correct trip setting of 
these circuit breakers is most important to achieving high-availability from your Liebert UPS system. 
For further information regarding proper trip settings for your feeder breakers, call 1-800-LIEBERT.
NOTE
The instantaneous trip setting of the breaker feeding the UPS bypass input should be high 
enough to accommodate short-duration overloads. The bypass static switch power path inside 
the UPS can draw up to 10 times the system’s rated current for up to three cycles.
NOTE
While Liebert can provide typical guidelines, the responsibility for the proper breaker trip 
settings outside the Liebert-manufactured UPS equipment resides with the owner. Contact 
Liebert Services at 1-800-LIEBERT for further details.