4. Repeat the test procedure for second fuse type, if present.
5. Repeat the test procedure for the second power bus, if present.
Figure 10. Test 3: Input Return to Fused Output Return (Type 1 Fuse)
Figure 11. Test 3: Input Return to Fused Output Return (Type 2 Fuse)
Test 4: Alarm Terminals—Connect the test probes alternately between the C and NC terminals
and the C and NO terminals on each set of alarm terminals. Verify that no continuity exists
between the C and NC terminals and that continuity exists between the C and NO terminals. 
If the fuse platform fails any of the specified tests, it is defective and must not be installed.
Contact ADC (see 
) for an RMA
(Return Material Authorization) and to reorder if replacement is required. 
4
INSTALLATION
This section provides procedures for mounting the fuse platform on a rack and installing wiring.
Wiring includes input, grounding, alarm, and output wiring.
TEST 4- POWER BUS B:
VERIFY THAT  CONTINUITY
EXISTS BETWEEN INPUT
AND TYPE 1 FUSED OUTPUT
RTN TERMINALS
TEST 4- POWER BUS A:
VERIFY THAT  CONTINUITY
EXISTS BETWEEN INPUT
AND TYPE 1 FUSED OUTPUT
RTN  TERMINALS      
18874-A
TEST 5- POWER BUS B:
VERIFY THAT  CONTINUITY
EXISTS BETWEEN INPUT
AND TYPE 2 FUSED OUTPUT
RTN TERMINALS
TEST 5- POWER BUS A:
VERIFY THAT  CONTINUITY
EXISTS BETWEEN INPUT
AND TYPE 2 FUSED OUTPUT
RTN TERMINALS