APC 10-40KW 400V UPS Manuel D’Utilisation

Page de 90
 
990-4050
 
Installation Guide APC Silcon 10-40kW 400V UPS 
3
 
Contents
 
1.0
Introduction 5
 
1.1
Tools and Equipment
 5
 
2.0
Unpacking 6
3.0
Installation 8
 
3.1
Requirements on Site
 8
3.1.1
Cabinet Dimensions H*xWxD - 1400xWx800 [mm]. Width as in below table:
 8
3.2
Footprint
 10
3.2.1
600mm UPS Cabinet with 1xBP I or Isolation Transformer
 10
3.2.2
800mm UPS Cabinet with 1xBP I or Built-in Isolation Transformer, or 2xBP I
 10
3.2.3
1000mm Cabinet for 10-20kW UPS with 3xBP I
 11
3.2.4
600mm Cabinet for 40kW UPS without Batteries
 11
3.2.5
1000mm Cabinet for 40kW UPS with 2xBP I
 12
 
4.0
External Connection 
13
 
4.1
Connecting the UPS
 13
4.1.1
Connecting the 10-20kW UPS
 13
4.1.2
Connecting the 40kW UPS
 15
4.2
System Integration Interface
 17
4.2.1
Connections
 18
4.3
Parallel Board
 19
4.4
Communication Interface Board
 22
4.4.1
Connections
 22
4.5
Connecting of APC Silcon Tripel Chassis
 23
4.6
APC Silcon Triple Chassis
 24
4.6.1
Safety Warnings
 24
4.6.2
Product Description
 24
4.6.3
Installing Management Peripherals
 25
4.6.4
Powering the APC Silcon Triple Chassis
 27
4.6.5
Troubleshooting
 28
4.6.6
Product Specifications
 29
4.7
APC Silcon Battery Cabinets
 32
4.7.1
Cabinets
 33
4.7.2
Preparing Batteries
 33
4.7.3
Mounting Batteries
 35
4.7.4
Final Checks
 37
4.7.5
APC Silcon Battery Cabinets
 38
4.8
Battery Breaker Box/Fuse-box
 40
4.8.1
Battery Breaker Box
 41
4.8.2
Battery Breaker Box Connection Diagram
 42
4.8.3
Fuse-box
 43
4.8.4
Fuse-box Connection Diagram
 44
4.8.5
UPS with External Battery in Battery Breaker Box/Fuse-box Configuration
 45
 
5.0
Programming Parameters 
46
 
5.1
Parameters
 46
5.1.1
Programming Keys
 47
5.1.2
Programming Example - Switch to Bypass Operation
 48
5.2
System Configuration
 48
5.2.1
Programming Example - Change Charge Voltage to 446
 50
5.2.2
Programming Example - Change to Output Isolation Transformer  available  
   51
5.3
Programming Parameters for Advanced Parallel Operation
 52
5.3.1
Description of Settings
 52
5.3.2
Programming example
 53
5.4
Battery Monitor
 53
5.4.1
Installation of new batteries
 53
 
6.0
Options/Accessories 54
 
6.1
Service Bypass Panel for Single Operation
 54
6.1.1
Wiring up UPS with SBP in TN-C-S Network
 56
6.1.2
Wiring up UPS with SBP in TN-S Network
 56