Juniper Networks EX3200 Manuel D’Utilisation
General Site Guidelines for EX Series Switches
Efficient switch operation requires proper site planning and maintenance, and proper
layout of the equipment, rack or cabinet (if used), and wiring closet.
layout of the equipment, rack or cabinet (if used), and wiring closet.
To plan and create an acceptable operating environment for your EX Series switch
and prevent environmentally caused equipment failures:
and prevent environmentally caused equipment failures:
■
Keep the area around the chassis free from dust and conductive material, such
as metal flakes.
as metal flakes.
■
Follow prescribed airflow guidelines to ensure that the cooling system functions
properly and that exhaust from other equipment does not blow into the intake
vents of the switch.
properly and that exhaust from other equipment does not blow into the intake
vents of the switch.
■
Follow the prescribed ESD prevention procedures to avoid damaging the
equipment. Static discharge can cause components to fail completely or
intermittently over time.
equipment. Static discharge can cause components to fail completely or
intermittently over time.
■
Install the switch in a secure area, so that only authorized personnel can access
the switch.
the switch.
Related Topics
■
■
Clearance Requirements for Airflow and Hardware Maintenance for EX2200
Switches
Switches
■
Clearance Requirements for Airflow and Hardware Maintenance for EX3200 and
EX4200 Switches on page 91
EX4200 Switches on page 91
■
Clearance Requirements for Airflow and Hardware Maintenance for an EX8208
Switch
Switch
■
Clearance Requirements for Airflow and Hardware Maintenance for an EX8216
Switch
Switch
■
■
Installing and Connecting an EX2200 Switch
■
■
Installing and Connecting an EX8208 Switch
■
Installing and Connecting an EX8216 Switch
Site Electrical Wiring Guidelines for EX Series Switches
Table 25 on page 84 describes the factors you must consider while planning the
electrical wiring at your site.
electrical wiring at your site.
General Site Guidelines for EX Series Switches
■
83
Chapter 4: Site Preparation