Nortel Networks CVX 600 Manuel D’Utilisation

Page de 168
Replacing Modules and Filler Panels
3-16
296-1011-202 Rel. 5.0, Doc. Rev. 02.01 
CVX 600 Hardware Installation Guide
Reference
For information about the SCC-SM LEDs, see the 
Replacing the SCC-LTM/RLTM
If you need to replace the SCC-LTM or SCC-RLTM, note the configuration of 
installed network cabling before you disconnect any cables. This includes cabling 
to the following ports:
Local 10/100 Mb/s Ethernet ports
Console port
HSSI port
Alarm port
T1 ports or E1 ports
Optical ports
You will need to reinstall this cabling on the replacement SCC-LTM/RLTM.
Removing the SCC-LTM or SCC-RLTM
To remove the SCC-LTM or SCC-RLTM, follow these steps: 
Caution: 
Before removing the SCC-LTM or SCC-RLTM, you must first 
remove the corresponding SCC-SMs. The LTMs and RLTMs are not 
hot-swappable (that is, you cannot change them while the system is 
running).
Step
Action
1
Turn off power by turning off the switches on the PDU.
2
Disconnect any cables attached to the SCC-LTM/RLTM.
Note: If you are using the alarm connections, you can leave the alarm wiring 
in place by removing the alarm connector block from the SCC-LTM/RLTM. 
Use a 1/8-inch flat-tip screwdriver to remove the alarm connector block.