Nortel Networks CVX 600 Manuel D’Utilisation
Installing the CVX 600 Chassis
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
1-21
Chassis Installation
Telco and EIA Rack Hole Spacing
You can use mounting flanges to install the CVX 600 chassis in a Telco or EIA
rack. Telco and EIA racks have 0.5-inch spacing between the dual mounting
holes, and 0.625-inch spacing between the dual mounting hole pairs.
rack. Telco and EIA racks have 0.5-inch spacing between the dual mounting
holes, and 0.625-inch spacing between the dual mounting hole pairs.
The following figure shows the positions on the mounting flange that you use for
Telco and EIA racks.
Telco and EIA racks.
Note:
Before you install the CVX 600 chassis in a rack, determine the
type of rack you have so that you can properly align the mounting holes.
1
2
3
4
5
1
2
3
4
5
6
7
EIA: Use positions 2 and 4
TELCO: Use positions 1, 3, 5
TELCO: Use positions 1, 3, 5
EIA: Use positions 1, 3, 5, 7
TELCO: Use positions 2, 4, 6
CVX-0222A
DC chassis option
AC chassis option