Nortel Networks CVX 600 Manuel D’Utilisation

Page de 168
Installing the CVX 600 Chassis
296-1011-202 Rel. 5.0, Doc. Rev. 02.01
1-21
Chassis Installation
Telco and EIA Rack Hole Spacing
You can use mounting flanges to install the CVX 600 chassis in a Telco or EIA 
rack. Telco and EIA racks have 0.5-inch spacing between the dual mounting 
holes, and 0.625-inch spacing between the dual mounting hole pairs. 
The following figure shows the positions on the mounting flange that you use for 
Telco and EIA racks. 
Note: 
Before you install the CVX 600 chassis in a rack, determine the 
type of rack you have so that you can properly align the mounting holes.
1
2
3
4
5
1
2
3
4
5
6
7
EIA: Use positions 2 and 4
TELCO: Use positions 1, 3, 5
EIA: Use positions 1, 3, 5, 7
TELCO: Use positions 2, 4, 6
CVX-0222A
DC chassis option
AC chassis option