Q-Logic 59096-04 Manuel D’Utilisation
4 – Installation
Installing a Switch
59096-04 A
4-7
A
If you are using the 10-Gbps ports, remove the port covers by the cover tabs using
your fingers or pliers as shown in
your fingers or pliers as shown in
Figure 4-4. Removing 10-Gbps Port Covers
To install XPAK switch stacking cables, position the cable connectors with the
circuit board toward the mid line of the respective switch faceplates as shown in
circuit board toward the mid line of the respective switch faceplates as shown in
. When installing the 3-inch XPAK switch stacking cable, insert the
cable connectors into the 10-Gbps ports at the same time.
Figure 4-5. Installing XPAK Switch Stacking Cables
A
L
A
L
A
L
A
16
L
A
17
L
A
18
L
A
19
L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A
L
A
16
L
A
17
L
A
18
L
A
19
L
A
L
A
L
A
L
A
L
A
L
A
L
A
16
L
A
17
L
A
18
L
A
19
L
A
Circuit Board