RuggedCom RS900G Manuel D’Utilisation

Page de 17
10 
 
2008 RuggedCom Inc. All rights reserved 
 
Rev104
 
2.3  HIPOT (Dielectric Strength) Testing 
 
Units which are to be “HIPOT” tested in the field must have the braided ground cable disconnected 
(see Figure 2.3.1) during the HIPOT test. This is required in order to prevent the transient/surge 
suppression circuitry, which is connected to Surge Ground (see Figure 2.3.1), from being activated 
during the HIPOT test. 
 
 
Figure 2.3.1 HIPOT (Dielectric Strength) Testing