3com 3CRWX440095A Manuel D’Utilisation

Page de 190
Deployment
43
To physically install MAPs:
Instruct the cabling installer to run the Cat. 5 Ethernet cable from the 
closest wiring closet to intended location of the MAP. 
Unpack the MAP, and select the appropriate mounting kit for your 
installation location.
Install the MAP at the indicated location on the floor. 
Connect the Cat 5. Ethernet cable(s) to the MAP.
At the wiring closet, connect the MAP to the infrastructure equipment:
If you are directly connecting the MAP to a WX switch, plug the other 
cable end(s) to the indicated port(s).
If you are indirectly connecting the WX to the switch, plug the other 
cable end(s) to an available network port on the wiring closet switch. 
If the switch does not supply PoE, then ensure that a mid-span PoE 
device is inserted in-line with the connection.
Deployment
Deployment is when WX configuration information in the 3WXM 
network plan is sent to your WX switch.
Configuration changes are collected in 3WXM when you save them, but 
are not applied to WX switches until you send the configuration to the 
WX switch and deploy the configuration to your network. Any changes 
you make to your network in 3WXM are saved, but not applied to your 
network until they are deployed. This method makes it easy to apply 
configurations simultaneously to multiple WX switches, or you can deploy 
changes to a single WX switch.