3com 4007R Manuel D’Utilisation

Page de 22
Quick Installation Guide
3
Switch Setup Tasks
Figure 2 illustrates the tasks to perform to set up a Switch 4007R 8-slot 
chassis.
Figure 2   Setup Tasks for Switch 4007R 8-slot Chassis 
ON
R
Switch 4007
1
2
3
4
5
6
7
8
9
10
Install the Chassis and
Optional Devices
4
Install a Power Supply and
the Power Cable
• Power Supply Installation Guide
for the 8-slot Chassis
5
Install a Switch Fabric
Module
• Switch fabric module quick
start or getting started guides
• Switch fabric module
user guides (if available)
Install Interface Modules
• Interface module quick start or
getting started guides
• Interface module user guides
(if available)
Determine Site Requirements
• Enterprise Switch Getting Started
Guide, Appendix B
1
Troubleshoot Problems
• Enterprise Management Engine
User Guide, Chapter 8
Administer and Operate
the Switch
• Enterprise Management Engine
User Guide, Chapter 4 and
Chapter 5
Configure the Switch for
Management
• Enterprise Management Engine
User Guide, Chapter 4 and
Chapter 5
11
Unpack the Switch 4007
Chassis
• “Unpacking Instructions”
(On the shipping box and
in this guide)
2
Install the Universal Mounting
Shelf (for a rack installation)
• Quick Installation Guide for
the 8-slot Chassis (this guide)
3
Install an EME Management
Module
• Enterprise Management Engine
Quick Start Guide
• Enterprise Management Engine
User Guide
7
Power On the Switch
• Enterprise Switch Getting Started
Guide, Chapter 5
10
Switch 4007 8-slot Chassis
12
8
9
6
Quick Installation Guide for
the 8-slot Chassis (this guide)
Quick Installation Guide for
the 8-slot Chassis (this guide)
4007RQS.book Page 3 Friday, January 25, 2002 10:27 AM