Siemens 411 Manuel D’Utilisation
Issue 03/01
2 Installation
MICROMASTER 411 & COMBIMASTER 411 Operating Instructions
6SE6400-5CA00-0BP0
21
2.1
Installation after a Period of Storage
Following a prolonged period of storage, you must reform the capacitors in the
inverter. The requirements are listed below.
inverter. The requirements are listed below.
100
50
75
0,5
1
[%]
2
4
6
8
Storage period less than 1 year:
Storage period 1 to 2 years:
Storage period 2 to 3 years:
Storage period 3 and more years:
No action necessary
Prior to energizing, connect to
voltage for one hour
voltage for one hour
Prior to energizing, form
according to the curve
Prior to energizing, form
according to the curve
according to the curve
Prior to energizing, form
according to the curve
Voltage
Time t [h]
Figure 2-1
Forming