Avaya 882 Manuel D’Utilisation

Page de 782
5-4
User Guide for the Avaya P580 and P882 Multiservice Switches, v6.1
Chapter 5
Timeliness Checks
The switch performs timeliness checks to ensure that PDUs are not 
reordered, delayed or replayed. These timeliness checks include the 
following information:
Number of reboots since the switch was upgraded from v5.
application software to v6.or since the last initialization of 
NVRAM. 
Number of seconds since the last switch reboot. 
When the NMS starts up, it sends the switch a request message for this 
information. The switch responds with a report PDU that contains the 
information. Once the NMS and switch have synchronized this information, 
the NMS inserts it in all PDUs that it sends to the switch. 
The switch discards any PDUs that contain: 
The incorrect number of switch reboots
A 150-second or greater discrepancy in the number of seconds since 
the last switch reboot. 
Views 
Overview
A view defines the specific object identifiers (OIDs) that either can or 
cannot be accessed by the user groups to which the view is assigned. 
View information is stored in the View-Based Access Control Model 
(VACM) MIB. Only users that have administrator access to the switch can 
use CLI commands to modify this MIB. Users that have administrator 
access can, however, give specific user groups read-write access to the 
MIB. Users or community strings assigned to those user groups can then 
use SNMP to view or modify the MIB. 
For information on how to configure a view, see “
.”