Alloy Computer Products NS-16T01FS Manuel D’Utilisation

Page de 37
 
8
 
Installation 
The site where you install the hub stack may greatly affect its 
performance. When installing, consider the following pointers: 
¾
 
Install the Switch in a fairly cool and dry place.  See 
Technical Specifications for the acceptable temperature 
and humidity operating ranges. 
¾
 
Install the Switch in a site free from strong 
electromagnetic field generators (such as motors), 
vibration, dust, and direct exposure to sunlight. 
¾
 
Leave at least 10cm of space at the front and rear of the 
Switch for ventilation. 
¾
 
Install the Switch on a sturdy, level surface that can 
support its weight, or in an EIA standard-size 
equipment rack.  For information on rack installation, 
see the next section, 
Rack . 
¾
 
When installing Switches on a level surface, attach the 
rubber feet to the bottom of each device.  The rubber 
feet cushion the Switch and protect the case from 
scratching.