Fujitsu RX900 S1 Manuel D’Utilisation

Page de 368
RX900 S1
Maintenance Manual
313
Cables
Figure 205: Connecting the chassis ID board cable
Ê
Connect the chassis ID board cable (1).
Ê
Slide the local service display inward until it clicks into place (2).
I
In order to enable ServerView Operations Manager and ServerView 
Installation Manager to identify the system, it is necessary to program the 
chassis ID prom using the "ChassisIDProm Tool" after installing the new 
chassis ID board. This tool is available for download from the following 
Fujitsu Technology Solutions support page:
http://partners.ts.fujitsu.com/com/service/intelservers/tools
0
/