Fujitsu 5.0L10 Manuel D’Utilisation

Page de 225
Appendix G Exclusive Control between 
Application Programs and RDB Commands
 
When an application program and RDB command operate simultaneously on the same database resource, the 
SymfoWARE/RDB system performs exclusive control. In this way, each process can be executed without 
contradiction. 
Each function performs processing by applying exclusive control of the resource specified by the option or input data. 
The period for which the resource is exclusively controlled is as follows: 
Application program: 
From the time the first SQL statement is issued from the application program until the application program 
terminates 
RDB command: 
From the time the command is entered until the response message is generated 
Table: Locked resources and locked strength for each SymfoWARE/RDB function shows resources for which 
lock is performed by each function and the strength of the lock. Table: Relationships among lock strengths 
shows the relationships among locked strengths. 
[Table: Locked resources and locked strength for each SymfoWARE/RDB function]
 
 
 
193