Fujitsu BX900 S1 Manuel D’Utilisation

Page de 144
BX900 S1
Operating Manual
69
Installation and operation
Ê
To properly shut down all server blades, press the On/Off button on the 
front of the system unit (position 4 in 
) for 4 seconds. All 
server blades will then be shut down.
Ê
To immediately shut down all server blades, press the On/Off button on the 
front of the system unit (position 4 in 
) for 10 seconds. 
All server blades are switched off immediately.
Other ways to shut down the system unit
Web interface of the management blade
You can also switch off the system unit and the individual server blades via 
the Web interface of the management blade (see manual "PRIMERGY 
BX900 Blade Server Systems ServerView Management Blade S1 User 
Interface Description").
After power failure
After a power failure, the system unit will switch itself on again automatically, 
and the server blades which were running prior to the power failure are 
automatically started up again according to the BIOS setting.
I
How to switch server blades on/off is described in the relevant operating 
manuals.