Sterling SVL-C Manuel D’Utilisation

Page de 49
SVL-A, SVL-B, SVL-C, & SVL-D Self-Contained Material Loaders - Venturi Style  9 of 49 
• 
Observe the safety instructions for the connected units.
 
Maintenance Responsibility
 
• 
Before beginning maintenance work:
 
 
Assign a supervisor.
 
 
Inform all other responsible operating personnel.
 
 
Turn off the main power supply.(If required)  
 
Set all compressed air lines on the unit at zero pressure. 
 
Repair work should ONLY be done by qualified personnel. 
•  ALWAYS turn off the main supply for all electrical work to avoid risk of death 
or injury. 
•  NEVER operate on a unit that is partially disassembled.  This can cause 
serious injuries including amputation and electric shock. 
•  In case of functional disturbances, switch the unit off IMMEDIATELY.  Any 
errors must be eliminated to avoid accidents. 
 
1-4 Unit 
Safety 
 
•  The unit may ONLY be used for conveying plastic granules and regrind on 
injection molding machines. 
•  NEVER change the settings unless you are able to foresee the 
consequences. 
• Use 
ONLY original manufacturer parts. 
•  Follow a regular maintenance schedule. 
•  Keep records of all maintenance and repair work. 
•  Be aware that electronic subassemblies may be damaged by static 
discharge. 
•  Before initial operation and at regular intervals, check all electrical 
connections for proper fit. 
•  NEVER modify sensors without knowing their precise functions. 
•  Make sure all plugs are connected properly. 
•  Note the carrying capacity of the machine flange. 
•  Read the operating manuals of the connected units.