Turbo Air TBD-2SD Manuel D’Utilisation

Page de 13
3
Turbo air
INSTALLATION OF THE CASTERS
According to model, refer to the assembly position of casters.
TCB-2SD, TBD-2SD, TBB-2SB, TBB-2SG
TCB-3SD, TBD-3SD, TBB-3SB, TBB-3SG
TCB-4SD, TBD-4SD, TBB-4SB, TBB-4SG
※This 
 
picture  is  a  plan  view  of  bottom  cabinets.
CB  is  an  abbreviation  of  the  caster  with  a  brake.
Other  casters  don't  have  a  brake.
TCB-2SD, TCB-3SD, TCB-4SD
TBD-2SD, TBD-3SD, TBD-4SD
TBD-2SB, TBD-3SB, TBD-4SB
Screw(M4xL12) x 4EA
Screw(M4xL12) x 4EA
Draft Tower Assembly
Draft Tower Assembly
Rubber Gasket
Rubber Gasket
DRAFT ARMS TOWERS Installation Schematic Diagram
* Assemble DRAFT TOWER as above drawing.