Sterling 100 Manuel D’Utilisation

Page de 63
Continuous Loss-in-Weight Blenders Chapter 
5: 
Maintenance
 52 
Chapter 5:  Maintenance 
5-1  Preventative Maintenance Schedule 
The mechanical design of the blender is simple and little maintenance is required.  The only 
moving parts are the re-fill valves, optional regrind agitators, metering augers, and optional 
discharge slide gates. The checklist below contains a list of items which should be inspected 
and/or replaced to keep your blender operating at peak efficiency.  Perform each inspection at 
the regular intervals listed below. 
Figure 52: Sample Preventative Maintenance Schedule 
System model # 
 
Serial # 
Daily 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect all hoppers 
for any loose parts 
- tighten them 
immediately. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Verify quality of 
compressed air 
supply. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Inspect all weigh 
hoppers for 
obstructions. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every week 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/ 
By 
Date/
By 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Verify the blender 
is properly 
calibrated. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Check to make 
sure that all hose 
connections are air 
tight.         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Every month 
Jan  Feb  Mar  Apr  May
Jun
Jul 
Aug
Sep  Oct  Nov
Dec
Inspect air regulator 
and air safety 
circuits, if equipped. 
 
 
 
 
 
 
 
 
 
 
 
 
Recalibrate  If 
necessary. 
 
 
 
 
 
 
 
 
 
 
 
 
Photocopy this page for your maintenance records