Sterling 238 Manuel D’Utilisation

Page de 43
Powder Hopper Loaders 
Page 29 
5-3  Starting the Loader 
1.  Insert the pickup probe into the material supply. 
2.  Turn on compressed air to the unit. 
3.  Plug in power to the control enclosure. 
4.  Move the power switch on the Series One graphic panel to 
the 
ON
 position. 
 
 
5-4  Changing the Conveying Sequence 
 
DANGER! 
DISCONNECT POWER 
BEFORE
 
OPENING THE CONTROL BOX. 
 
Electric current, CAPABLE OF 
CAUSING INJURY OR DEATH
, MAY BE 
PRESENT in the controller enclosure 
during these procedures. 
 
The adjustments listed in this section 
must be performed 
ONLY
 by a 
qualified, safety-conscious technician.
 
 
The Series One controller is a time-fill mode controller, and has 
sixteen (16) loading sequences to select. Make sure you avoid 
over-filling the receiver!
 Figure 2 lists loading times and number 
of blowback pulses in each sequence. Use the chart as your 
model;
 select a sequence that suits your needs.