Emerson XDCF Manuel D’Utilisation

Page de 28
Checklist for Proper Installation
18
6.0
C
HECKLIST
 
FOR
 P
ROPER
 I
NSTALLATION
___ 1. Liebert XDCF modules are securely attached to the cabinet.
___ 2. Piping from Liebert XDP or Liebert XDC, with isolation valves, properly connected to each 
Liebert XDCF module.
___ 3. Flex piping connections to prefabricated header assembly are secure and according to 
specifications.
___ 4. Check the R-134a refrigerant charge.
___ 5. System checked for leakage.
___ 6. Run system and verify that the Liebert XDP or Liebert XDC and the Liebert XDCF modules 
operate properly.
___ 7. Piping is insulated.