Furuno 1833C Manuel D’Utilisation

Page de 100
1-19 
 
Antenna unit chassis, cover opened 
 
10. Fix the signal cable with the cable clamp. 
11. Release the stay and close the cover. Loosely fasten the cover fixing screws; you will 
have to make some adjustments inside after completion of wiring. 
 
Note: When closing the cover, set the gaskets to grooves in the bottom chassis, then 
tighten bolts. 
BOTTOM 
CHASSIS
GASKET
GROOVE
SCANNER BOLT
Torque : 9.8 ±0.1 N  m
.