Desa (V) CB36(N Manuel D’Utilisation

Page de 40
6
www.desatech.com
117437-01
UNIT DIMENSIONS
(V)CB36 B-Vent Fireplace
UNIT DIMENSIONS
Mantel  Clearances
(V)CB36N, (V)CB36P, (V)CB36NE and (V)CB36PE
MANTEL CLEARANCES
Figure 8 shows projected mantel depths at various heights above
the top of the louver opening. Figure 7 shows the minimum allow-
able distances from various mantel components in relation to the
both sides of the fi replace opening.
Figure 9 - Clearances for Combustible Mantels 
WARNING: When fi nishing appliance, do not overlap
combustible materials onto the black front face. Brick,
tile, or other non-combustible materials may be applied
to the face provided that any fi replace openings are not
blocked and gaps in the material used and the face are
sealed with a non-combustible caulking.
7 7/8" (200 mm)
TO CENTER OF
4"  B-VENT
14 3/4"
(375 mm)
TO NAILING
FLANGES
5/8"
(16 mm)
36"
(914 mm)
FACE DIM.
36 1/4"
(921 mm)
FACE DIM.
15 3/8"
(390 mm)
35 3/4"
(908 mm)
1 1/2 "
(38 mm)
6" (152 mm)
37" (940 mm)
TO NAILING
FLANGE
4 1/2"
(114 mm)
ELECTRICAL
INLET
8" (203 mm)
GAS SUPPLY
INLET
36 3/4"
(934 mm)
36 1/4"
(921 mm)
TO NAILING
FLANGE
2.0"
(51 mm)
1 1/4"
(32 mm)
38"
(965 mm)
5 7/8"
(150 mm)
TO
NAILING
FLANGE
WALL SWITCH
WIREWAY
WALL SWITCH
WIREWAY
2.5 "
(63.5 mm)
11 1/8"
(283 mm)
AIr Kit
Location
33°
SAFE
ZONE
1 1/2”
(38 mm)
1 3/4”
(44 mm)
3.5”
(89 mm)
5 1/4”
(133 mm)
10”
(254 mm)
Perpendicular
Side Wall
Combustible
Material May
Be Used
Outer Surround
To Fireplace
Opening
C
B
A
D
E
F
G
Top of Louver Opening
3
2
1
4
5
6
7
Stud Wall
Ref. Mantel Depth Ref.
Mantel from Top
of Louver Opening
4" B-Vent
Flue Pipe
2x4 Header
@ 1" Min.
Clearance
 
7  2” (51mm) 
G  6” (152mm)
 
6  4” (102mm) 
8” (203mm)
 
5  8” (203mm) 
10” (254mm)
 
4  10” (254mm) 
D  12” (305mm)
 
3  12” (305mm) 
C  14” (356mm)
 
2  14” (356mm) 
16” (406mm)
 
1  16” (406mm) 
18” (457mm)
Figure 7 - (V)CB36 Unit Dimensions 
Figure 8 - Side Clearances for Combustible Mantels