Leica 1000Z01 Manuel D’Utilisation
106
TPS-System 1000 Programs-2.3.1en
© Leica
IV
EL
AH
OH
BS
SM
AS
FS
BL
RH
Measure Base Point
This dialog is used in accordance with the settings of
the system function "Measure & Record" or according
to the dialog shown below.
the system function "Measure & Record" or according
to the dialog shown below.
REMHT\ MEASURE BASE PT
14:03
ALL
DIST
REC
TARGT REMOT
α
NUM
F1
F2
F3
F4
F5
F6
Point no.
:
Station12
Hz
:
16°55'50"
V
:
91°16'20"
Refl.Height :
1.664
m
Slope Dist. :
-----
m
Height diff :
-----
HELP
CONF
I<>II
Point No.
: The point number of the base point.
Hz
: Horizontal direction from the remote
point to the base point.
V
: Vertical angle to the remote point.
Refl.Height
: Reflector height used for the target
point.
Slope dist.
: Slope distance from the instrument
station to the base point.
Height diff
: Height difference between the base
point ground and the instrument
ground.
ground.
Simultaneously measure and record in the active file.
Proceed with the "REMOTE POINT" dialog.
Proceed with the "REMOTE POINT" dialog.
Measure a distance. Record the measurement in the
active file and proceed with the "REMOTE POINT"
dialog.
active file and proceed with the "REMOTE POINT"
dialog.
Measure the distance. Accept the measurement without
recording. Proceed with the "REMOTE POINT" dialog.
recording. Proceed with the "REMOTE POINT" dialog.
MC