3M 5797A-MT Manuel D’Utilisation

Page de 12
6
78-8126-0432-6-A
4.0 Install Splice
4.1
Install connectors.  See Table on front cover of 
this instruction for proper connector dimensions.
Crimp connectors per recommendations from 
connector manufacturer. For standard 3M
connectors, refer to the table at the end of this 
instruction for crimping information.
4.2
Apply a tape marker to core semi-con insulation 
screens of Cable Y (cable side which does not 
contain splice body) at a distance of 10"
(254 mm) measured from the CENTER of
connectors.
4.3
Position cold shrink copper connector adapter over
CENTER of connector. 
Shrink the adapter near
center of connector by pulling and unwinding the
loose core ribbon end in a counter-clockwise
direction.
4.4
Remove any excess oxidation inhibitor from 
connector ends if aluminum connectors are used. 
Clean cable using standard practice:
a.  Do not use solvent or abrasive on cable 
semi-conductive insulation shield. 
b.  If abrasive is used on cable insulation, do not
reduce diameter below the 1.07" (27,2 mm)
minimum specified for the splice. 
10" (254 mm)