Adtran 550 Mode D'Emploi

Page de 412
Section 3  Network Turnup Procedure
ATLAS 550 System Manual
 52
© 2004 ADTRAN, Inc.
61200305L2-1B
1.
INTRODUCTION
This section discusses the ATLAS 550 System installation.
2.
TOOLS REQUIRED
The tools required for installation of the ATLAS 550 unit are:
#2 Phillips-head screwdriver
Flat-head screwdriver (for installing modules)
3.
UNPACK AND INSPECT THE SYSTEM
The ATLAS 550 is shipped in its own cardboard shipping carton. Open the carton carefully and avoid deep 
penetration into the carton with sharp objects. 
After unpacking the unit, inspect it for possible shipping damage. If the equipment has been damaged in 
transit, immediately file a claim with the carrier, and then contact ADTRAN Customer Service (see the 
contact information in the front of this manual).
Contents of ADTRAN Shipments
Your ADTRAN shipment includes the following items. (Shipping contents for the modules begin on 
page 57.)
The ATLAS 550 unit
The ATLAS 550 Product CD
AC power cord - ADTRAN P/N 3127031 (with AC systems)
19” rackmount brackets and screws
RJ-45 to DB-25 adapter - ADTRAN P/N 3196ADPT006
To prevent electrical shock, do not install equipment in a wet location or during a 
lightning storm.
Electronic modules can be damaged by static electrical discharge. Before handling 
modules, put on an antistatic discharge wrist strap to prevent damage to electronic 
components. Place modules in antistatic packing material when transporting or storing. 
When working on modules, always place them on an approved antistatic mat that is 
electrically grounded.
   Customers must supply the Ethernet cable.