ATTO Technology diamond array s Manuel D’Utilisation

Page de 105
69
 
ATTO Technology Inc. Diamond Storage Array Installation and Operation Manual
 7.0  Hardware Maintenance
The disk drive sleds, blower assemblies, power supplies, host interface cards, and system management 
card may be replaced with identical or upgraded parts. 
WARNING
The only way to completely de-energize the unit is 
to turn off both power 
supplies and unplug both 
power cords from the 
back of the unit.
Turning the power switch 
to the Stand-by position 
on one power supply 
does not completely turn 
off power to the array; it is not an AC on-off switch. 
Power may still be in the unit through the other 
power supply.
CAUTION
CAUTION
All modular components must be replaced 
by qualified personnel only. 
Do not leave empty openings in the Diamond 
Storage Array. Empty openings affect airflow and 
may cause the unit to overheat and shut down.
Components are electrostatic sensitive. Use 
proper grounding methods when working with or 
around the array. 
Always store spare components in proper ESD 
containers when not in use.
The power supply and blower assembly may be 
replaced while the unit is running. (Refer to Hot Swap 
Operating Instructions on page 71
)
•  Host interface cards and management cards may only 
be replaced when the Diamond Storage Array is off. 
Backup the unit fully before replacing these 
components.
•  You may remove a disk drive sled while the array is 
powered on. Refer to the instructions in 
 for details.
To remove a management card
1
Power down both power supplies. 
2
Loosen the screws holding the card in place.
3
Pull out the assembly and replace it with 
another. 
4
Securely tighten all screws after replacing the 
component.
To remove a disk drive sled (Exhibit 7-2)
1
Loosen the screws on either side of the assembly
2
Pull on the assembly’s handle and carefully 
slide it out of its bay.
3
Replace the disk drive sled with another sled.
To remove a Host Interface Card
1
Power down both power supplies
2
Remove any cable attached to the port. 
3
Loosen the retaining screws
4
Pull the Host Interface Card out of the unit. 
5
To replace the card, push it back into the unit 
and tighten the retaining screws. 
To remove the power supply (Exhibit 7-4),
1
Press the Stand-by power switch to the off position
2
Remove the power cord
3
Using a No. 1 Phillips screwdriver, loosen the 
screws holding the assembly in place. 
4
Pull out the assembly and replace it with 
another. 
5
Securely tighten all screws after replacing the 
component.
To remove a blower assembly (Exhibit 7-4), 
1
Using a No. 1 Phillips screwdriver, loosen the screws 
holding the assembly in place. 
2
Pull out the assembly and replace it with 
another. 
3
Securely tighten all screws after replacing the 
component.
WARNING
Do not leave empty openings on the front 
or rear of the Diamond Storage Array under 
any circumstances.
Power Switch Positions
         On               Stand-by
Exhibit 7-1: The management card may be accessed via a 
serial port DB-9 connector  or an optional Ethernet 
connection.