Hussmann nav-4 Manuel De Montage

Page de 7
 
 
 
P/N 2400204D
2-1 
PREPARATION OF CABINET FOR OPERATION
Removing Cabinet From Crate 
Move the display Merchandiser as close as possible
to its permanent location and remove hold-down 
brackets at the front and rear of the cabinet. Check
refrigeration lines to see that they are "free" and no
damage has occurred during ship.  
Check fan blades for free operation. 
Operation 
Always allow the cabinet to warm up to 65° F 
before starting the unit. If the cabinet has just been 
delivered from a cold ambient, such as winter, wait 
least 16 hours before starting. 
LEVELING THE CASE 
 
 
 
 
 
     
These cases should be leveled before being installed 
definitively, to allow the maximum drain of the
condensed water as well as an appropriate
alignment of the doors and operation. If these cases
don’t have an appropriate leveling, the water can
cause bad operation 
These cases are correspondents with installed 
levelers.Level the unit according to the place where
it will operate and to adjust like is required.   
INSTALLATION OF SHELF   
 
The installed Shelves are modulated. These they
can be retired of their original position and adjusted
to different heights. 
Should the unit be disconnected when running, wait
5 minutes before restarting. This allows the
refrigerant pressures to equalize and prevents the
compressor from cycling on its overload protector. 
It is advisable to run the unit for 5 to 8 hours before 
loading it with product. This is to allow the air
inside the display merchandiser to cool down. 
Load Limits
Each merchandiser has a load limit decal. At no 
time should merchandiser be stocked beyond the
load limits indicated. 
If load limit is violated, it 
may result in loss of contents. 
 
Raise 
Lower