Hussmann proto-aire Manuel De Montage

Page de 124
Protocol™ Installation and 
Service Manual 
Rigging and Hoisting 
 
The installer is responsible for ensuring that the equipment used to move the Protocol™ is 
operated within its limits.  Under no circumstances should the top of the unit or the outer 
panels be used for lifting or moving the unit.  For strap rigging, run the straps under the top 
level of compressor mounting channel. 
 
 
Vibration Pads 
 
Vibration Isolation Pads are supplied with each Protocol™ unit.   To adjust for slightly 
uneven floors, place 16 gauge galvanized steel shims between the vibration pads and the 
floor (shims must be field supplied).  One vibration pad is installed under each upright 
channel.  Vertical units use four pads.  Horizontal units use 8 to 10 pads. 
 
 
6