Hussmann proto-aire Manuel De Montage

Page de 124
Protocol™ Installation and 
Service Manual 
7. Momentarily 
turn 
ON compressor breaker #1 and verify correct pumping direction.  
Check all compressors before switching any wires.  If all compressors are rotating 
backwards, change two legs at the field side of the convenience switch.  For 
individual compressor, change the Legs on the load side of the compressor 
contactor. 
 
8.  Remove Forced Conditions 
 
Final Checks 
 
Return Gas Superheat 
 
Return gas superheat should be 10 to 30 °F on all units 
 
Once system is up and running, it is the responsibility of the installer to see that all the final 
adjustments are made so the Protocol™ delivers maximum temperature performance and 
efficiency for the customer.  These include: 
 
 
Thermostatic Expansion Valve superheat adjustment 
 
Electronic Pressure Regulator settings 
 
Defrost scheduling and timing 
 
Condenser flow balance 
 
High and low pressure controls 
 Thermostat 
settings 
 
Adjustments to electronic controls 
 
Electronic oil level controls 
 
Thoroughly inspect all field piping while the equipment is running and add supports where 
line vibration occurs.  Be sure additional supports do not conflict with pipe expansion and 
contraction. 
 
When merchandisers are completely stocked, check the operation of the system again. 
 
At 90 days recheck the entire system, including all field wiring. 
 
Caution 
Never run the compressors in a vacuum as 
this may quickly damage the compressors. 
 
 
 
 
Control Settings 
 
High Pressure Safety – 395 psig 
Vacuum Pressure Safety – 0 psig 
Discharge Temperature Sensor – 240 °F 
 
It is mandatory that the mechanical low-pressure controls be set in the field 
 
Electronic Oil Level Control 
 
 
103