Hussmann proto-aire Manuel De Montage

Page de 124
Protocol™ Installation and 
Service Manual 
 
 
 
Protocol™ with Heat Reclaim 
Oil Return System Not shown 
 
When heat reclaim (for water or air) is used with the Protocol™ a 3-Way Heat Reclaim 
Valve should be installed after the oil separator.  A bleed line should be installed from the 
heat reclaim valve to the angle valve found in the suction header.  A check valve is 
installed in the heat reclaim return loop.  This check valve ensures that back flow through 
the heat reclaim coil is eliminated when heat reclaim is not used.  Refer to specific 
manufacturers guidelines for sizing reclaim coils.  In the case of water heat reclaim, a 10# 
check valve should be used to bypass the water tank in the case that the pressure drop 
across the tank become excessive. 
Suction
Filter
Angle Valve
L
iqu
id
 Branch Line
Suction Branc
h
 Line
Case
Case
Case
Case
Compressors
Suction Header
Blee
d Line
Turba-Shed 
Oil Separator
Check Valve
Discharge Header
Heat 
Reclaim 
Coil
Sight Glass
Liquid Line
Filter / Drier
Receiver
3-Way Heat Reclaim Valve
Condenser
 
 
43