Hussmann proto-aire Manuel De Montage

Page de 124
Protocol™ Installation and 
Service Manual 
 
Hot Gas 
 
Control Board energizes the Aux Relay Coil, which de-energizes the Main Liquid Line 
Pressure Differential Solenoid.  The valve reduces liquid supply line pressure.  The Control 
Board also energizes the Defrost Relay coil, which open Hot Gas Solenoid valves and 
closes the Suction Solenoid valves.  Each case terminates defrost through individual defrost 
termination thermostats, and goes into drip cycle until branch is timed off by the Control 
Board. 
 
Note:  Only 20% of the cases may be defrosted at once because of the requirement to keep 
a refrigeration load on the compressors to provide gas for defrost. 
 
 
 
Electric Defrost 
 
Control Board locks out certain compressors to cover heater Amp draw.  Control Board 
energizes two Defrost Board Relay Coils for each Defrost Circuit: 
1)  The first closes the POWERLINK™ 
2)  The second opens the Electric Heaters are energized.  Branch Liquid Line 
Valve closes.  Compressors not locked out maintain case refrigeration for 
units not in defrost.  Defrost is temperature terminated. 
3)  See POWERLINK™ operation diagram on Page 97.  See Page 105 for 
further information on defrost operation. 
 
 
89