Extreme x250e-24p Manuel De Montage
Installing Summit Family Switches
Summit Family Switches Hardware Installation Guide
98
Rack-Mounting a Summit Switch (Models Other than
Summit X650 Series)
Summit X650 Series)
This section describes how to install Summit switches in the following series:
●
Summit X150
●
Summit X250e
●
Summit X350
●
Summit X450
●
Summit X450a
●
Summit X450e
To install the switch in a rack, you need the following tools and equipment:
●
Mounting brackets (provided)
●
Screws (provided) to secure the mounting brackets to the switch
■
Eight M3 screws for Summit X350, X450, X450a, and X450e series switches
■
Twelve M4 screws for Summit X150 and X250e series switches
●
Four rack mounting screws
The screw size will vary based on your organization’s rack system; screws are not provided.
●
Screwdriver for securing the switch to your organization’s rack
The screwdriver size will vary based on the requirements of your organization’s rack system.
●
AC power cord
An AC power cord is not included with the Summit family switch. You must obtain a power supply
cord that meets the requirements listed under
cord that meets the requirements listed under
To rack-mount a Summit switch:
1
Place the switch upright on a secure work surface.
2
Place a mounting bracket over the mounting holes on one side of the unit.
3
Insert the screws and fully tighten with a suitable screwdriver, as shown in
.
Figure 66: Attaching the Mounting Bracket
4
and
for the other side of the switch.
S
olid O
N = Link
Blinki
ng =
Activity
34
33
36
35
38
37
40
39
42
41
44
43
46
8
4
5
4
47
46X
45X
48X
47X
S
h
a
red
Port
s
S
H_035
b
S450_007
Summit X350, X450, X450a,
and X450e, series
and X450e, series
Summit X150 and X250e series