3com S7906E Manuel De Montage
2-9
Configuration procedure
# Add OLT 3/0/1 and OLT 3/0/2 to an isolation group.
<Sysname> system-view
[Sysname] interface olt3/0/1
[Sysname-Olt3/0/1] port-isolate enable
[Sysname-Olt3/0/1] quit
[Sysname] interface olt3/0/2
[Sysname-Olt3/0/2] port-isolate enable
[Sysname-Olt3/0/2] quit
# Display the isolation group information.
<Sysname> display port-isolate group
Port-isolate group information:
Uplink port support: NO
Group ID: 1
olt3/0/1 olt3/0/2
Fiber Backup Configuration Example
Network requirements
Add two OLT ports of the same EPON board to a fiber backup group one after the other.
Perform a manual switchover between the two OLT ports. When the master port is shut down, the
slave port becomes the new master port.
slave port becomes the new master port.
Network diagram
Figure 2-2
Network diagram for fiber backup group configuration
OLT3/0/1
OLT3/0/2
OLT
POS
ONU2
ONU1
ONUn
2:N
Configuration procedure
# Create fiber backup group 1.
<Sysname> system-view
[Sysname] ftth
[Sysname-ftth] fiber-backup group 1
Create group 1 successfully.
# Add port OLT 3/0/1 and then OLT 3/0/2 to fiber backup group 1. Thus, OLT 3/0/1 works as the master
port and OLT 3/0/2 the slave port.
port and OLT 3/0/2 the slave port.
[Sysname-fiber-group1] group member olt3/0/1