APC BMF3-A Fascicule

Page de 2
2
APC REPLACEMENT BRICK PRODUCTS Surge Protective Device (SPD)
INSTRUCTIONS
9/08
990-3490
(8251-0138A)
1.  Turn off all power to the SPDR Brick.
2.  Mark the phase cables for the brick to be replaced (if they are not already   
 
marked) with the appropriate A, B, or C phase and unplug the 
 
communication cable from the brick.
3.  Remove the phase, neutral, and ground wires (if applicable) from the brick.
4.  Remove and discard the 4 fastening nuts and carefully remove the brick.   
 
See Figure 1.
5.  Install the new brick using the hardware kit supplied insuring that fastening   
 
nuts are tight.
6.  Attach the phase cables, neutral, and ground wires (if applicable) to the   
 
associated brick lugs ensuring the lug set screws are tight.  Refer to Table 
 
 
2 for the proper torque specifications.
7.  Check that all connections are secure. Remove all tools and discarded   
 
hardware from the unit.
8.  Plug the communication cable into the brick receptacle following the plug   
 
orientation guide attached to the brick.
9.  Replace the barrier, cover/door, and/or trim to the equipment (if applicable).
10. Equipment may be re-energized after all of the above steps are complete.
Figure 1: Replacement Brick
Communication Port
Fastening Nuts
Fastening Nuts
Three Phase, 3- or 4-Wire,
Grounded Wye Installation
NAME
PLATE
Name Plate