Canon LV-7490 Brochure

Page de 24
LV-7490    Basic Serial Command Specifications   
                                                                                     
  
10 
6.5.  POWER ON Command 
Command “C00” 
[CR] 
Detail 
Power ON 
When already Power is ON, nothing is done. 
When sending this command during processing Countdown, Countdown is 
terminated. 
Response 
Acceptable [ACK] 
[CR] 
Unacceptable “?”[CR] 
 
6.6.  POWER OFF Command (Quick Power OFF) 
Command “C01” 
[CR] 
Detail 
Power OFF (Standby)
 
When Power is OFF with POWER button of the projector and remote control, 
“Power OFF?” is displayed. However, as soon as this command is sent, Quick 
Power OFF is executed. 
Response 
Acceptable [ACK] 
[CR] 
Unacceptable  “?”[CR] 
 
6.7.  POWER OFF Command 
Command “C02” 
[CR] 
Detail 
Power OFF (Standby).
 
The command operates the same Power OFF function as POWER button of the 
projector and remote control. 
Once this command is sent, “Power OFF?” is displayed. If this command is sent 
again while it is displayed, Power OFF is executed. 
When sending this command during Countdown, Countdown is terminated. 
Response 
Acceptable [ACK] 
[CR] 
Unacceptable “?”[CR] 
 
6.8.  Computer 1 Command 
Command “C05” 
[CR] 
Detail 
Select Computer 1 Input 
Although projector returns “OK”, Auto input is not executed with this command 
while Auto input is set to On1 or On2.
Response 
Acceptable [ACK] 
[CR] 
Unacceptable  “?”[CR] 
 
6.9.  Computer 2 Command 
Command “C06” 
[CR] 
Detail 
Select Computer2 Input 
Note 1) Although projector returns “OK”, Auto input is not executed with this 
command while Auto input is set to On1 or On2. 
Note 2) When “Monitor out” is selected in Terminal menu, projector returns “OK” 
and displays “Monitor out” on the screen. 
Response 
Acceptable [ACK] 
[CR] 
Unacceptable  “?”[CR]