ASUS RS720-E7/RS12 Guide D’Installation Rapide

Page de 16
Cache Vault Accessory Kit 
4.  Install the PIKE 2208 card installed 
with the Cache Vault Flash Module 
on the system. Connect the cable 
from the Cache Vault Power Module 
to the Cache Vault Flash Module.
5.  Secure the cable to the bottom 
chassis cover using a piece of 
acetate cloth tape.
Installing the kit on RS920-E7/RS8, RS926-E7/RS8 server systems
1.  Take out the riser card bracket from 
the system and place it on a flat, stable 
surface. Locate the three screws.
For more details on how to uninstall the riser card bracket, refer to the user 
manual that came with your server system.
2.   Align the two screws on the side 
of the steel CVPM holder installed 
with the Cache Vault Power Module 
to the screw holes of the full-height 
steel bracket. Secure the holder 
assembly with the bundled screws 
(3).
3.  Place the holder assembly into the 
system and secure it with the screw 
removed earlier in step 1.
6