Juniper CBL-PWR-10AC-STR-UK Manuel D’Utilisation

Page de 232
Packing the M7i Router for Shipment
To pack the router for shipment:
1.
Retrieve the shipping crate and packing materials in which the router was originally
shipped. If you do not have these materials, contact your Juniper Networks
representative about approved packaging materials.
2.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect
the strap to one of the ESD points on the chassis. Verify that the router is attached to
a proper earth ground.
3.
Power off the router. See
4.
Disconnect power from the router: .
Unplug the power cord from each power supply. See
NOTE:
When multiple AC power supplies are installed in the chassis,
each AC power cord (one for each power supply) must be unplugged
to disconnect power completely from the router.
See
.
NOTE:
All DC power cables must be disconnected to disconnect power
completely from the router.
5.
Remove the cables that connect to all external devices. For instructions, see
and
.
6.
Remove all Field Replaceable Units (FRUs) from the router.
7.
Remove the router from the rack:
If you are using a mechanical lift, place the lift platform under the router, unscrew
and remove the mounting screws from the rack, and move the router to the shipping
crate.
If you are not using a mechanical lift
If the router weight is fully supported by a shelf or another router, unscrew and
remove the mounting screws from the rack. Then, move it to the shipping crate.
If the router weight is not fully supported by a shelf or another router, one person
should grasp the router while another person unscrews and removes the mounting
screws from the rack. You can then move the router to the shipping crate.
197
Copyright © 2012, Juniper Networks, Inc.
Appendix G: Contacting Customer Support and Returning M7i Hardware