APC Smart-UPS DP BATTERY CABINET SUDPBP1 Fascicule
Codes de produits
SUDPBP1
990-1013, Revision 1, 7/99
2
6. If the Smart-UPS DP has both options, repeat steps 2 through 5 to install the ferrite bead for the second option. The
following figure shows two ferrite beads installed since the Smart-UPS DP is equipped with both the extended run
battery cabinet and the service bypass panel.
battery cabinet and the service bypass panel.
Ž Signal connector for the service bypass panel option
• Signal connector for the extended run battery cabinet option (shown with ferrite installed)
• Signal connector for the extended run battery cabinet option (shown with ferrite installed)
7. Replace the rear panel cover on the Smart-UPS DP.
•
Ž