Cisco Cisco Tunnel Terminating Gateway (TTG) Guide De Dépannage

Page de 192
PDN Gateway Overview   
▀  How the PDN Gateway Works 
 
▄  Cisco ASR 5000 Series Packet Data Network Gateway Administration Guide 
OL-22985-01   
 
Figure 10.  PDN Connection Release by the UE Call Flow 
eAN/ePCF
HSGW (MAG)
P-GW (LMA)
UE
PPP VSNCP-Term-Req
3
Attached
1
2
PPP VSNCP-Term-Ack
4
PBU
5
PBA
6
RA
 
 
Table 4. PDN Connection Release by the UE Call Flow Description 
Step
 
Description
 
1
 
The UE is attached to the EPC and has a PDN connection with the P-GW for PDN-ID=x and APN with assigned HNP.
 
2
 
The UE decides to disconnect from the PDN and sends a PPP VSNCP-Term-Req with PDNID=x.
 
3
 
The HSGW starts disconnecting the PDN connection and sends a PPP-VSNCP-Term-Ack to the UE (also with PDNID=x).
 
4
 
The HSGW begins the tear down of the PMIP session by sending a PBU Deregistration to the P-GW with the following 
attributes: Lifetime=0, MNID, APN, ATT=HRPD, HNP. The PBU Deregistration message should contain all the mobility 
options that were present in the initial PBU that created the binding.
 
5
 
The P-GW looks up the Binding Cache Entry (BCE) based on the HNP, deletes the binding, and responds to the HSGW 
with a Deregistration PBA with the same attributes (Lifetime=0, MNID, APN, ATT=HRPD, HNP).
 
6
 
The HSGW optionally sends a Router Advertisement (RA) with assigned HNP and prefix lifetime=0.