Cisco Cisco Tunnel Terminating Gateway (TTG)

Page de 424
GTPP Accounting Overview   
▀  Triggers for Generation of Charging Records 
 
 
▄  GTPP Interface Administration and Reference, StarOS Release 16 
40 
   
 
Delete PDP context request received from GGSN 
 
Cancel Location received from HLR 
 
Delete subscriber data received from HLR 
 
Inactivity timeout on the SGSN 
 
Manual subscriber clearing 
 
command "
clear subscribers all
 
ISRAU scenario (PDP is released at the OLD SGSN) 
 
Abnormal Releases such as path failures 
The following table lists the different values for the CauseForRecordClosing field depending on the different trigger 
scenarios. 
Table 12.  Cause for Record Closing 
Cause For Record Closure 
Cause
 
Scenarios
 
Partial/Final
 
Value
 
 
Configurable
 
normalRelease
 
 
delete PDP from MS 
 
delete PDP from GGSN 
 
PDP Release due to ISRAU scenario 
Final
 
0
 
No
 
abnormalRelease
 
 
 Path failure 
 
Attach on Attach 
Final
 
4
 
No
 
SGSN Change 
PDP Release in old SGSN due to ISRAU scenario. 
Final 
18 
No 
volumeLimit
 
configured volume threshold has been exceeded 
Partial
 
16
 
Yes
 
timeLimit
 
configured interval has been reached 
Partial
 
17
 
Yes
 
maxChangeCondition
 
limit for the LOTV containers was exceeded 
Partial
 
19
 
Yes
 
managementIntervention
 
e.g. using the command "
gtpp interim now
" and also 
"
clear subscribers all
Partial
 
20
 
No
 
managementIntervention
 
i.e. using the command "
clear subscribers all
"
 
Final
 
20
 
No
 
intraSGSNIntersystemChange
 
change of radio interface from GSM to UMTS or vice-
versa
 
Partial
 
21
 
No