Cisco Headend System Release 2.5
Appendix C
Direct ASI Installation and Configuration Procedures
136
4004148 Rev C
Checkout Procedures for the ASI Card
Introduction
After completing the procedures in this appendix to install and configure the ASI
card, complete some or all of the tests in this section to confirm that the ASI card is
working as intended. These tests are in outline form, only. Cisco assumes that
upgrade engineers are familiar with the detail behind each test.
card, complete some or all of the tests in this section to confirm that the ASI card is
working as intended. These tests are in outline form, only. Cisco assumes that
upgrade engineers are familiar with the detail behind each test.
Confirming the Session Count
After completing the procedures in this appendix to install and configure the ASI
card, complete some or all of the tests in this section to confirm that the ASI card is
working as intended. These tests are only in outline form. Cisco assumes that
upgrade engineers are familiar with the detail behind each test.
1 Press the Options button on the front panel of the BFS QAM until the Session
card, complete some or all of the tests in this section to confirm that the ASI card is
working as intended. These tests are only in outline form. Cisco assumes that
upgrade engineers are familiar with the detail behind each test.
1 Press the Options button on the front panel of the BFS QAM until the Session
Count appears.
2 Confirm that the number of sessions on the BFS QAM is equal to the number of
BFS sessions on the DNCS.
3 Re-run the procedures in Verify DBDS Stability (on page 22).
Verify DBDS Stability
Re-run the procedures in Verify DBDS Stability (on page 22).