Samsung RT5000 Top Freezer Twin Cooling Plus™, 318L Manuel D’Utilisation

Page de 48
Installation
English
26 
Ins
tallation
Step-by-step installation
STEP 1 Select a site
Site requirements:
•  Solid, level surface without carpeting or flooring that may obstruct ventilation
•  Away from direct sunlight
•  Adequate room for opening and closing the door
•  Away from a heat source
•  Room for maintenance and servicing
•  Temperature range: between 10 °C and 43 °C
Clearance
See the pictures and table below for space requirements for installation.
01
02
Model
A
B
C
RT38
1275
1001
115°
RT38 (Glass 
Door Only)
1290
1001
115°
RT35
1275
1001
115°
RT35 (Glass 
Door Only)
1290
1001
115°
RT32
1221
1040
135°
RT29
1221
1040
135°
(unit: mm)
01 100 mm
02 50 mm
03 at least 50 mm
B
C
A
03
03
Untitled-2   26
2016-03-21     10:53:32