DESCRIPTION
The Oil Intensifier System (OIS) is intended to generate
pressure up to 500 MPa (75 000 psi) using an OPG1
(whose maximum pressure is 200 MPa (30 000 psi)). The OIS
includes a 5:1 intensifier. The intensifier is used only
when necessary to generate pressure > 200 MPa (30 000
psi).
pressure up to 500 MPa (75 000 psi) using an OPG1
(whose maximum pressure is 200 MPa (30 000 psi)). The OIS
includes a 5:1 intensifier. The intensifier is used only
when necessary to generate pressure > 200 MPa (30 000
psi).
INSTALLATION
n
Position the OIS between the OPG1 and the PG7302
with the OPG1 to the right and the PG7302 to the left.
o
Using a DH500 coned and threaded tube, connect
the OPG1 lateral TEST port to the OIS's SUPPLY
port (1).
port (1).
p
Using a DH500 coned and threaded tube or two
tubes and a tee, connect the PG302 TEST port to the
OIS's lateral TEST port (2).
OIS's lateral TEST port (2).
Operation: Intensifier Not In Use (Pressure
< 200 MPa (30 000 psi))
< 200 MPa (30 000 psi))
n
Open LOW PRESSURE SHUTOFF valve (4) and
close INTENSIFIER SHUTOFF valve (5). In this
condition, OPG1 generates pressure straight through
the Intensifier System, bypassing the intensifier.
condition, OPG1 generates pressure straight through
the Intensifier System, bypassing the intensifier.
o
Plug TEST port (6) if it is not being used.
Operation: Using Intensifier (Pressure > 200 MPa
(30 000 psi))
(30 000 psi))
OPG1 generates and adjusts pressure up to 200 MPa
(30 000 psi). Generally, the OIS intensifier is used
only when running tests that include pressures
greater than 200 MPa (30 000 psi). The OIS may be
switched into and out of use under pressure.
(30 000 psi). Generally, the OIS intensifier is used
only when running tests that include pressures
greater than 200 MPa (30 000 psi). The OIS may be
switched into and out of use under pressure.
n
When running tests that include pressures above 200
MPa (30 000 psi), connect the device under test
(DUT) to the upper TEST connection (6) of the OIS.
(DUT) to the upper TEST connection (6) of the OIS.
o
Set pressures under 100 MPa (15 000 psi) using the
OPG1 above, without the intensifier.
p
To switch in the intensifier, first close the LOW
PRESSURE SHUTOFF valve (4), then open the
INTENSIFIER SHUTOFF valve (5). In this condition
the OPG1 pressure is shut off from the PG7302 and
is applied to the low side of the intensifier. Increasing
pressure on the low side of the intensifier results in
pressure changes five times greater on the high side
(PG7302 side) of the intensifier.
INTENSIFIER SHUTOFF valve (5). In this condition
the OPG1 pressure is shut off from the PG7302 and
is applied to the low side of the intensifier. Increasing
pressure on the low side of the intensifier results in
pressure changes five times greater on the high side
(PG7302 side) of the intensifier.
q
Use the OPG1 to generate and adjust pressure as
necessary to set test points and float the PG7302
piston.
piston.
r
Before switching out the intensifier, be sure that the
PG7302 piston is fully down (LSTOP) as the pressure
may change abruptly during the switching procedure.
If possible, switch out the intensifier at the same
may change abruptly during the switching procedure.
If possible, switch out the intensifier at the same