3com WX4400 3CRWX440095A Manuel D’Utilisation

Page de 198
108
C
HAPTER
 5: U
SING
 RF A
UTO
-T
UNING
 
WITH
 M
ODELLING
Create Your RF 
Coverage Area
To create your RF coverage area, you create a wiring closet (mandatory if 
you have direct MAPs in your plan), designate an area for RF coverage, and 
add your distributed MAPs or direct MAPs to the coverage area. Distributed 
MAPs are indirectly attached through intermediate Layer 2 or Layer 3 
devices. Direct MAPs are directly attached to dedicated WX switch ports.
Create a Wiring
Closet
To add the location of a wiring closet to the floor plan 
Display the floor plan in the Content panel.
In the Task List panel, click Tools.
In the Wiring Closer/Misc area under Coverage Area, click the 
 (Insert 
Wiring Closet) icon. 
Click in the floor display where you want to place the wiring closet. The 
Create Wiring Closet wizard appears. 
In the Name box, type the name of the wiring closet (1 to 60 characters, 
with no tabs).
Click a WX switch in the Available Devices box, then click the Add button 
to move it to the Current Devices box.
Click Finish to save the changes. The wiring closet is displayed on your 
floor plan.