3com WX4400 3CRWX440095A Manuel D’Utilisation

Page de 198
154
C
HAPTER
 7: M
ANAGING
 
AND
 M
ONITORING
 Y
OUR
 N
ETWORK
Select one or more WX switches. 
To select multiple switches, press Shift (for contiguous switches) or 
Control (for noncontiguous switches) while clicking.
In the Local Changes group in the Task List panel, click Deploy. The 
Deploy Configurations dialog box appears.
The dialog lists the switches that have configuration changes.
Select the switches to which you want to deploy the changes. 
To select more than one WX, click Shift while clicking to select contiguous 
items, or click Ctrl while clicking to select noncontiguous items.
Click Deploy.
The deployment status for each affected WX is shown in the History 
window at the bottom left of the dialog box. 
3WXM performs verification of the changes. If errors occur, they are 
listed in the Selected Errors at the bottom right of the dialog box. If there 
are errors, fix them and verify the changes before trying to deploy again. 
(You can use the Verification tab to fix the errors.)
If the deploy is successful, 3WXM also instructs the WX switch to save the 
changes in its configuration file.
Click Close.
You can click Close at any time after clicking Deploy. The operation 
continues in the background. To review the status of the operation, use 
the operation log. (Select View Operation Log.)
To schedule deployment of local changes
Select the Devices tool bar option.
At the bottom of the Task List panel, select Change Management. 
Select one or more WX switches. 
To select multiple switches, press Shift (for contiguous switches) or 
Control (for noncontiguous switches) while clicking.
In the Task List panel in the Local Changes group, click Schedule 
Deploy. The Schedule Deploy dialog box appears.
Edit the start date and time. 
(The date and time are based on the date and time on the machine 
where 3WXM Services is installed.)
Click OK.