kymco mo d200 Instruction De Maintenance

Page de 8
16
. BATTERY/CHARGING SYSTEM
16-4
DINK 200
BATTERY
Remove the seat and met-in box. (2-3)
Remove the battery cover screw and the
battery cover.
Remove the battery.
First disconnect the battery negative (-) cable
and then the positive (+) cable.
The installation sequence is the reverse of
removal.
BATTERY VOLTAGE INSPECTION (OPEN
CIRCUIT VOLTAGE)
Disconnect the battery cables.
Measure the voltage between the battery
terminals.
Fully charged : 13.2V
Undercharged : 12.3V max.
CHARGING
Connect the charger positive (+) cable to the
battery positive (+) terminal.
Connect the charger negative (-) cable to the
battery negative (-) terminal.
Charging current : Standard : 0.9A
Quick
: 4A
Charging time
: Standard : 5_
10 hours
Quick
: 30 minutes
After charging: Open circuit voltage: 12.8V min.
Battery Cover Screw
When disconnecting the battery positive
(+) cable, do not touch the frame with
tool; otherwise it will cause short circuit
and sparks to fire the fuel.
Keep flames and sparks away
from a charging battery.
Turn power ON/OFF at the
charger, not at the battery terminals to
prevent sparks near the battery.
Charge the battery according
 
to
the current specified on the battery.
During quick charging, the battery
temperature should not exceed 45℃ .
• Quick charging should only be done in
an emergency.
• Measure the voltage 30 minutes after
the battery is charged.
Battery charging inspection must be
performed with a voltmeter.
First connect the positive (+) cable and then
negative (-) cable to avoid short circuit.