Hoshizaki f043-809 kmd-410mwh Manuel D’Utilisation

Page de 65
2. SEQUENCE OF OPERATION 
The steps in the sequence are as outlined below. When power is supplied, a 5 second delay 
occurs at startup. Note that the order of the LEDs from the outer edge of the board is 5, 6, 8, 
9, 4, 7.
 
 
[a] ONE MINUTE FILL CYCLE 
LED 8 is on. HWV opens and the fill period begins. After 1 minute, the board checks for a 
closed LF/S. If LF/S is closed, the harvest cycle begins. If not, HWV will remain energized 
through additional 1 minute cycles until water enters the sump and LF/S closes. This serves 
as a low water safety to protect the water pump.
 
 
[b] INITIAL HARVEST CYCLE 
LEDs 5, 6, and 8 are on. HWV remains open, Comp energizes, HGV opens, and harvest 
begins. As the evaporator warms, the thermistor located on the suction line checks for a 9°C 
temperature. When 9°C is reached, a 3.9 k signal turns the harvest over to the adjustable 
harvest timer which is factory set for normal conditions. The timer has settings of 60, 90, 120, 
and 180 seconds (S1 dip switch 1 & 2). When the harvest timer completes its count down, 
the harvest cycle is complete and the freeze cycle starts. 
The minimum total time allowed by the board for a complete harvest cycle is 2 minutes. 
HWV is open during harvest for a maximum of 6 minutes or the length of harvest minus 0, 
10, 30, or 50 seconds (adjustable by S1 dip switch 7 & 8), whichever is shorter. LED 8 goes 
off when HWV closes. PM energizes and runs for the last 0, 10, 30, or 50 seconds of harvest 
depending on S1 dip switch 7 & 8 setting. LED 7 comes on when PM energizes. At the end 
of harvest, the control board checks the position of LF/S and proceeds to the freeze cycle if 
it is closed or calls for a 1-minute fill if it is open.
 
 
[c] FREEZE CYCLE 
LEDs 5 & 7 are on. Comp continues to run, PM and FMS energize, HGV closes and the 
freeze cycle starts. For the first 5 minutes after the thermistor temperature reaches 2°C, the 
control board will not accept a signal from LF/S and UF/S. This minimum freeze period acts 
as a short cycle protection. At the end of this period, LF/S and UF/S assumes control. As ice 
builds on the evaporator the water level in the sump lowers and LF/S opens, FWV opens 
(LED 9 is on when FWV is open). The refill will last until UF/S closes or for 60 seconds, 
whichever is shorter. After UF/S closes, FWV closes 3 seconds later. KMD-410 refills 1 time. 
After the refill, the freeze continues until LF/S opens again and terminates ice production.
 
 
[d] DRAIN CYCLE 
LEDs 4, 5, 6, and 7 are on. Comp continues to run, HGV opens, FMS de-energizes. PM 
stops for 2 seconds, DV energizes, then restarts to take water from the sump and force it 
through DV and down the drain. When the drain timer stops counting, the drain is complete. 
The drain timer is 10 or 20 seconds (S1 dip switch 3 & 4). Drain cycle always occurs on the 
2nd harvest after startup. Then, depending on the control board setting, drain cycle occurs 
every cycle, or every 2nd, 5th, or 10th cycles (S1 dip switch 5 & 6).