Intel SR1680MV Manuel D’Utilisation
100
Intel
®
Server System SR1680MV Service Guide
Figure 65. Location Of Spring Screw Holes
Table 43. Location and Adapt Depth for Racks
Procedure to install the rail kit
Note: Please follow the steps below before you install the rail:
1. To avoid a potential electrical shock hazard, a third wire safety grounding
conductor is necessary for the rack installation.
2. The equipment rack must provide sufficient airflow to the system to maintain
proper cooling.
Procedure:
1. Put the tighten screws2 into the washers.
2. Install the tighten screws2 with washers into the hole of the rails (Recommended
2. Install the tighten screws2 with washers into the hole of the rails (Recommended
Driver Force: 5 lb-in).
Sprong Secure Hole
Adapt Depth For Racks
HOLE 1
782.0~794.5 mm
HOLE 2
769.5~782.0 mm
HOLE 3
757.0~769.5 mm
HOLE 4
744.5~757.0 mm
HOLE 5
732.0~744.5 mm
HOLE 6
719.5~732.0 mm
HOLE 7
707.0~719.5 mm