NEC scp200 Manuel D’Utilisation

Page de 6
ISSUED: 12-16-04   SHEET #: 120-9015-3   11-05-10
5 of 6
Visit the Peerless Web Site at www.peerlessmounts.com
For Technical Support Contact Peerless Mounts at 1-800-729-0307 or 708-865-8870.
Drill holes for four ceiling anchors (detail 2). Position the holes so that when the steel cables (E) are attached and 
taut they will angle out at 15°. 
Insert loose end of steel wire (E) through one end of cable lock (I) as shown below. NOTE: Steel wires can only 
insert one way through cable lock as shown in fi gure 5.2.
Route steel wires through hole of ceiling tray as shown in fi gure 5.1. Loop steel cables through ceiling tray (A)
where indicated by black rectangles in detail 3. Finish by routing loose end of steel cable through other end of 
cable lock. Feed cable through cable lock until all cables are taut.
When this step is complete, the weight of the ceiling tray should be supported by the steel cables.
© 2007 Peerless Industries, Inc.  All rights reserved. 
Peerless is a registered trademark of Peerless Industries, Inc.
All other brand and product names are trademarks or registered trademarks of their respective owners.
4
5
E
FIGURE 5.1
FIGURE 5.2
DETAIL 3 - TOP VIEW
I
Wood Joists or Beams
Drill 5/32" (4 mm) dia. 
holes to a minimum depth 
of 1.5" (38 mm). Secure 
steel cables (E) using 
wood screw (G)
Solid Concrete
Drill 5/16" (8 mm) dia. holes to a mini-
mum depth of 2.25" (57 mm).  Hammer 
in concrete anchors (H) and secure 
steel cables (E) with wood screw (G)
Truss Ceiling
No anchor required.  Loop 
upper end of steel cable (E)
around ceiling truss and down 
into hole of cable loop. Pull 
steel wire tight.
G
E
E
E
H
G
DETAIL 2
BLACK RECTANGLES REPRESENT CORRECT 
POSITIONS FOR STEEL WIRE
• It is the responsibility of the installer to verify that the ceiling to which the suspended ceiling kit is anchored will safely
support the combined load of all attached components (Projector Mount, Extension Column, etc.) and equipment.
WARNING